2022年1月2日日曜日

STATE OF MISSION REPORT DECEMBER 2021

Pandora in progress. Mplan override command sequence L0 complete. M signal field substable, wipeout sequence 8 in progress. GR+, PGR+. MASTERPIECE v3.4 upgraded into DREAMLAND v0.1. Minimum M / DL / HP / MDS / SD requirements met, VTX requirements not met.